How to install linear bearings?



1. Before installing linear bearings, the raw edges, dirt and surface scars of the mechanical mounting surface must be removed. Linear bearings are coated with antirust oil. Please clean the datum surface with cleaning oil before installation. Usually, the datum surface is easy to rust after removing the antirust oil.
2. the linear bearing will be gently placed on the bed, the use of lateral fixing screws or other fixing fixture to make the line rail and the side mounting surface gently fit. Before installation and use, it is necessary to confirm whether the screw holes are consistent. Assuming that the machining holes of the base are not consistent and the bolts are forcibly locked, the combination accuracy and use quality will be greatly affected.
3. Tighten the positioning screw of the linear bearing in order from the center to both sides, so that the track is fitted with the vertical mounting surface, and stable accuracy can be obtained from the central position to both ends. After the vertical datum is tightened slightly, the locking force of the lateral datum is strengthened, so that the linear bearing can practically fit the lateral datum.
4. Use the torque wrench to lock the torque one by one according to various materials, and slowly tighten the positioning screw of the linear bearing slide rail.
5. Use the same installation method to install the auxiliary rail, and install the slide seat to the main rail and auxiliary rail individually. Note that after installing the linear slide on the slide seat, many accessories cannot be installed due to the limited installation space. The required accessories must be installed together at this stage.
6. Gently place the moving platform onto the sliding seat of the linear bearing main rail and auxiliary rail, and then lock the lateral pressing screw on the moving platform, which can be completed after installation and positioning.